Caledonian has completed hotel projects for brands including Hilton, Premier Inn and Jury’s Inn. With full factory fit-out and rapid deployment leading to swift return on investment, offsite construction is a perfect fit for the hotel industry.

 

The Caledonian is flexible enough to meet a variety of specifications as demanded by different vendors’ requirements for a variety of hotel specifications. Our construction system more than exceeds the desired acoustic requirements for this sector and can be further enhanced to cater for five star developments.

Our offsite construction techniques are proven with developers, operators and mainstream brands in the delivery of 2, 3 and 4 star hotels. Our experienced design teams can integrate advanced methods of offsite construction with traditional construction elements to provide rapid build programmes for new hotels and extension projects.

Offsite solutions guarantee delivery timescales providing hotel operators with accurate opening dates and enable upgrade and expansion to be undertaken with minimal disruption to existing hotel operations.

With our offsite modular building solutions a 100-bed hotel can be erected in just 2 weeks.

We can design and deliver hotel buildings in excess of 20 storeys high and with a full range of cladding and glazing solutions, as well as support for structures including balconies and walkways.

Enquire today

Case studies

Hinkley Point, Bridgwater

Fire Service College

Hilton Garden Inn

Premier Inn Manchester